Koerner House Foundation Work 2008 (www.gustavekoerner.org/photos.htm)
The new beam supports the floor of the second room on the main floor. Also shown is the new concrete floor and sump drain, plus the block wall 7 November 2008.

koerner 8 001 koerner 8 002 koerner 8 003 koerner 8 004
koerner 8 001.jpg koerner 8 002.jpg koerner 8 003.jpg koerner 8 004.jpg